Email: info@jiagewy.com Tel: +86-13716472383 Language:

News & Blogs


Construction method of JIAGE asphalt driveway sealant

Construction method of JIAGE asphalt driveway sealant ThinkCSS

Construction method of JIAGE asphalt driveway sealant

   JIAGE asphalt driveway sealant have excellent high-temperature stability and low-temperature resistance to brittleness. The construction steps of asphalt driveway sealant are as follows:

    1.Use a grooving machine to cut along the road cracks, removing at least 3 millimeters on each side of the crack.

   2.Remove dust, debris, and miscellaneous materials from the grooves. 

   3.Heat the asphalt driveway sealant and use a crack sealant gun to squeeze it into the grooves, ensuring it fills the entire depth of the crack for effective sealing. 

asphalt driveway sealant


CATEGORIES

LATEST NEWS

CONTACT US

Contact: Amanda Wang

Phone: +86-13716472383

Tel: +86-13716472383

Email: info@jiagewy.com

Add: B01-1-1705, Fuli Canal 10, Tongzhou District, Beijing, China

Leave a message

 
Top