JIAGE asphalt driveway sealant have excellent high-temperature stability and low-temperature resistance to brittleness. The construction steps of asphalt driveway sealant are as follows:
1.Use a grooving machine to cut along the road cracks, removing at least 3 millimeters on each side of the crack.
2.Remove dust, debris, and miscellaneous materials from the grooves.
3.Heat the asphalt driveway sealant and use a crack sealant gun to squeeze it into the grooves, ensuring it fills the entire depth of the crack for effective sealing.
Many construction workers believe that Put down
Do you know what is the best sealant for concret
How long does cold patch asphalt last In the ext
Contact: Amanda Wang
Phone: +86-13716472383
Tel: +86-13716472383
Email: info@jiagewy.com
Add: B01-1-1705, Fuli Canal 10, Tongzhou District, Beijing, China
We chat